Integration of hydropower and solar PV: a case study

In spring 2024, Easy Hydro completed the refurbishment of a hydropower scheme at a private estate in Ireland, including the design of a new automation strategy. The site also has solar PV installed and features a water storage pond, and therefore one of the major goals of the project was only to operate the turbine when the sun is not shining in order to gain the maximum benefit from the scarce water resources.

After one year of operations, Easy Hydro has analysed the system’s performance and confirmed that it operated as expected. With a peak output of 17 kW, the yearly generation was 40.6 MWh, which was concentrated at night except for the period between December and February, when the turbine had enough water to operate 24/7.

Despite the seasonal variations in the river flow, the control system successfully optimises the water resources, complementing the PV production and maximising the renewable energy generation.

Monthly power generation and storage pond level variation from May 2024 to May 2025

We are proud to see real-world data validating our design and control strategy, delivering reliable and efficient renewable energy to the site

Share the Article:

Related Articles

Easy Hydro developed a solution to optimally schedule the production from hydropower plants under the iAMP-Hydro project. The system requires as input the operational plant data, the site-constraints, and a 7-day ahead price forecast to generate hourly production plans. By...

Easy Hydro attended the @HY4RES Partner Meeting on April 7-9, hosted by @Instituto Superior Técnico in Lisbon, Portugal. The 3-days meeting comprised plenty of updates and progress. During the second day, we visited the energy community pilot site and participated...

Stay Tuned

Subscribe to receive updates on new projects, innovations, and insights into sustainable hydropower.