Benefits

Green renewable energy for self-consumption or grid sale from 1 up to 500+ kW

Negligible environmental impacts, minimal water requirements and no need of artificial reservoirs

Quick return on investment and simplified maintenance

Our turbines are 100% Made in Italy

Quick lead time, typically less than two months

Plug-and-play turbines, easy installation and commissioning

Applications

Run-of-river Micro Hydropower
Energy recovery from water networks
Energy Recovery from mines

The technology: Pumps as Turbines (PAT)

Consisting of conventional water pumps used in reverse as turbines (more information)

Fully customizable

The five stages of the Easy Hydro process: feasibility study, engineering design, equipment supply, commissioning and optimization.

info@easyhydrosolutions.com