In-pipe pico hydropower saves an Irish rural water network 15,600 kWh of electricity

The 3 kW peak pico pump-as-turbine designed by the Easy Hydro team has been operating for the last 12 months.

The 3 kW peak pico pump-as-turbine designed by the Easy Hydro team has been operating for the last 12 months. The turbine is located at the inlet of a gravity-fed raw water supply line, and contributes to reducing the energy demand of the adjacent treatment works by nearly 20%.

Get in touch with Easy Hydro:

[contact-form-7 id=”102″ title=”Contact form 1″]
Share the Article:

Related Articles

We’re excited to announce that Easy Hydro will be exhibiting at the upcoming IWA World water congress & exhibition in Glasgow (UK) on October 4th-8th.  Why visit Easy Hydro’s stand? At our booth N. 109 you’ll discover how Easy Hydro...

What if a hydropower plant could know when electricity prices will rise… and plan accordingly? We’ve built a system that combines a 7-day ahead electricity price prediction model with an optimisation engine to decide when and how much energy to...

Stay Tuned

Subscribe to receive updates on new projects, innovations, and insights into sustainable hydropower.