Easy Hydro provides a wide range of services to help with your hydropower project

Easy Hydro's roots are in over twelve years of small hydropower research. Building on that wealth of knowledge and culture of innovation, our engineers can offer innovative and low-cost ways of implementing hydro energy recovery within existing water infrastructures
The five stages of the Easy Hydro process: feasibility study, engineering design, equipment supply, commissioning and optimization.

Easy Hydro’s Engineers offer world-class prefeasibility studies to help you make the most cost effective and energy efficient decision for your business.

WHAT IS A PRE-FEASIBILITY STUDY?

A pre-feasibility study is an early-stage analysis of a potential project. It typically gives an overview of a project’s logistics, benefits, capital requirements, key challenges and other information deemed important to the decision-making process. Saving you time and money in the long run.

Easy Hydro’s roots are in over twelve years of small hydropower research. Building on that wealth of knowledge and culture of innovation, our engineers can offer innovative and low-cost ways of implementing hydro energy recovery within existing water infrastructures. Whether down a mine, in water/wastewater treatment plant or on an industrial cooling system, we can provide a solution to customers willing to reduce their energy bills and cut down on CO2 emissions.

Below are charts taken from a pre-feasibility done for one of our customers.

Examples of pre-feasibilities

#easyhydro #energyrecovery #reliability #hydropower #pumpsasturbines #energyefficiency

Share the Article:

Related Articles

We are thrilled to announce the commissioning of a new hydropower energy recovery project at the inlet of a drinking water treatment plant in Southern Europe. By installing our turbine on the raw water inlet line of the plant, the...

Easy Hydro developed a solution to optimally schedule the production from hydropower plants under the iAMP-Hydro project. The system requires as input the operational plant data, the site-constraints, and a 7-day ahead price forecast to generate hourly production plans. By...

Stay Tuned

Subscribe to receive updates on new projects, innovations, and insights into sustainable hydropower.