In-pipe pico hydropower saves an Irish rural water network 15,600 kWh of electricity

The 3 kW peak pico pump-as-turbine designed by the Easy Hydro team has been operating for the last 12 months.

The 3 kW peak pico pump-as-turbine designed by the Easy Hydro team has been operating for the last 12 months. The turbine is located at the inlet of a gravity-fed raw water supply line, and contributes to reducing the energy demand of the adjacent treatment works by nearly 20%.

Get in touch with Easy Hydro:

[contact-form-7 id=”102″ title=”Contact form 1″]
Share the Article:

Related Articles

Taking place in Munich on May 4th–7th, IFAT is the reference show for the latest water and environmental technologies. At this year’s edition you will be able to find an Easy Hydro energy recovery turbine on show at the SAER...

Easy Hydro has recently delivered the outline design document for a hydropower scheme to be installed at a Water Treatment Plant in Ireland. The Easy Hydro turbine will be placed at the inlet of the treatment plant, harnessing the hydropower...

Stay Tuned

Subscribe to receive updates on new projects, innovations, and insights into sustainable hydropower.