Easy Hydro

Energy recovery from the water cooling system of a 40 MW Francis turbine

  • 1 Inlet of the cooling system, with the water coming from the main penstock
  • 2 Turbine and generator
  • 3 On/Off automatic valve
  • 4 Fast-acting pressure relief valve
  • 5 Control and automation panel

Share the Case Study:

Related Case Studies

Head:
Flow:
Maximum output: