Easy Hydro

Energy recovery at the inlet of a water treatment plant

  • 1 On/Off membrane valve
  • 2 Raw water from the intake (5.5 bar)
  • 3 Turbine and generator
  • 4 Water to storage tank
  • 5 Pre-existing control valve (bypassed)

Share the Case Study:

Related Case Studies

Head:
Flow:
Maximum output:
Head:
Flow:
Maximum output: