Easy Hydro

Update of an old hydropower installation

  • 1 Old 650 kW Francis turbine
  • 2 New turbine and generator
  • 3 On/Off automatic valve
  • 4 Control and automation panel
  • 5 Pressurized penstock to the power station

Share the Case Study:

Related Case Studies

Head:
Flow:
Maximum output: