A few days ago, the Easy Hydro team has submitted a feasibility study to an European water utility. The scope of the study was to assess the technical/economic feasibility of recovering energy by installing a 9 kW water turbine at the inlet of a gravity-fed water storage reservoir.
The project will only require minor modifications to the existing pipework, and will allow our customer to generate clean electricity as a byproduct of their operations.
If you have a potential hydropower site, please get in touch with us for a free-of-charge pre-feasibility study which will help to identify the best way forward!