Easy Hydro commissions a new turbine in snowy Ireland

4.5 kW Easy Hydro turbine_3

Despite the snowy weather, our team has recently commissioned a new turbine at an enchanting remote location in Ireland. The Easy Hydro generation equipment has allowed our customer to refurbish a previously existing hydro site and to re-start producing electricity for self consumption. The system is capable of working autonomously and with minimal upkeep, thanks to the presence of a control panel operating the in-series flow control valve according to the amount of water available at the intake.

Easy Hydro offers a unique knowledge to design and implement small-scale hydropower generation, in a way that is cost-effective and modular. Get in touch with the team for a free-of-charge assessment of your project!