The two turbines are installed in parallel and are located 50 m below the ground level on the discharge line from the mine water treatment plant. After passing through the turbines, the water is then released into a nearby watercourse.
The energy recovery system was designed and installed as an integral part of the water management infrastructure of the mine, with the aim of minimizing the environmental impact of the mineral extraction operations. Since last November, Easy Hydro’s innovative low-cost hydro solution is helping our customer to self-generate over 20% of the energy needed to run its water treatment plant!
#easyhydro #mining #pumpsasturbines #innovation #energyefficiency #lowcost #selfgenerate #energyrecovery